求职意向
项目管理 广东广州 薪资面议 随时到岗
教育背景
2020.x -2020x Chinese People's Liberation Army ShenYang artillery Academy Electronic And Information Engineering
Main courses:
C++,Digital circuit,Analog circuit,Electronic circuit CAD,Matlab program design and Application,Signals and systems,Remote sensing information processing ,Single chip microcomputer principle and Application,Microcomputer principle,Principle and application of programmable device,Computer Network,Computer System, SDN network, VMWARE NSX.
2020.x -2020x Japan Shizuoka University Computer Science and Technology
Main courses:
Compilation principle、Computer Network、Database principle、Assembly language、C++、Java。Main research directionSearch Engine Optimization
工作经验
2020.x -2020x GuangZhou Evergrande Group Senior Systems Management
1.Responsible for the planning and design of the infrastructure. Not limited to network, storage, virtualization, database, application architecture.
2.Collaborate with the factory construction center department to make initial planning, technology selection, architecture design for factory construction, and propose reliable architecture models and Corporate standards.
3.Responsible for the design and planning related to the intelligentization of Auto company:
The intelligent chemical factory includes:
(1). Intelligent campus (mainly designing and planning based on the IoT, IoT platform, basic network, and security network).
Responsibilities: Responsible for the construction of the internal MES network, core network, IoT platform, and security intelligent network of new energy vehicle companies' new factory.
Achievements: Shanghai/Guangzhou Evergrande Smart Automobile Factory's internal assembly workshop computer room, backbone network, smart wall Internet of Things, factory import and export monitoring, industrial acquisition network construction
(2).
Intelligent production (mainly based on intelligent production related MES equipment , AGV , RFID, 5G platform selection and planning).
Responsibilities: Responsible for the construction of MES high-availability servers in the production workshop and the improvement plan of the IoT technology for production.
Achievement: MES high-availability server platform design. Participate in the determination of the 5G solution for the AGV IoT logistics car.
Technology selection
of 4G handhelds. Participate in the planning and construction of RFID identification network.
(3). Intelligent system (cooperate with MES, ERP, OA, SCM, AS teams to provide a reliable basic platform, as well as a data exchange and interconnection platform)
Responsible for the operation and maintenance of the infrastructure part of the internal business systems.
Responsibilities: Lead the infrastructure team, provide a powerful back-end platform for each business system, and handle daily operation and maintenance issues.
Achievement: Collaborate with the back-end team to provide infrastructure technical solutions for the enterprise's MES\ERP\OA\SCM\AS system virtualization platform and application construction, including middleware and DB.
4. Responsible for the planning and construction of the group's existing network, IDC, and production campus.
Responsibilities: According to the group's internal construction plan and needs, propose a reasonable, highly available, and high-performance system construction plan, participate in the review of various business system plans, and build the group's key IDC and production bases.
Achievements: Construction of Guangzhou Dongyong Data Center, Guangzhou Nansha Factory Data Center, and Shanghai Factory Data Center. Participate in the construction of group disaster recovery system.
5. Responsible for the design and construction of the group's public cloud.
Responsibilities: Participate in the design and implementation of the connection between public and private clouds according to the internal needs of the group.
Achievements:
Complete the leased lines connection between Alibaba Cloud, Azure and on-primse DC.
Collaborate with the business team to complete the data connection between the cloud and private On-primse DC for the IoV and the online car rental system.
Complete deployment of O365 and AD on Azure Cloud.
6. Responsible for group network security design and terminal security management and control. Such as WAF, webpage tamper-proof, cross-site scripting, SQL injection, etc.
Achievement: A network security design was proposed for the group DC to ensure that the system passed the three-level guarantee requirements.
Participate in
Security baseline-related fortress machines、database audit products、WAF、 border firewalls、 authority control、 situational awareness and other product technology selection、B
idding、Procurement and
Implementation
.
Participate in terminal security related VDI、 terminal control software、antivirus technology selection and so on.
7. Responsible for the infrastructure resource planning of the group's Azure cloud migration to Alibaba Cloud and the migration of Alibaba Cloud resources to Tencent Cloud, not limited to Iaas, PaaS, SaaS planning,、supplier management、architecture design and implementation management.
2020.x -2020x Midea Group Infrastructure
1. IT system and network construction and integration planning of overseas acquisition companies (Toshiba、KUKA)
2. Planning of Overseas Infrastructure Construction (Data Center, Virtualization, Network, Desktop, Security, Mail and so on)
3. Infrastructure Construction Project Management (Budget, Purchase, Delivery, Payment)
4. System operation and maintenance and outsourcing management (network, data center operation and maintenance management)
Responsibilities:
Responsible for the design and construction of IT infrastructure-related networks and DCs.
At the same time, Japan's Toshiba white goods gradually transitioned to Midea's network during the transition period of TSA, in line with Toshiba's safety standards.
For the reconstruction of the original Toshiba MES, RDM, ERP, PDM, SCM, FIN, and other historical systems to provide infrastructure services and data export.
Newly built infrastructure system that meets the standards of Midea.
Responsible for the planning and implementation of Toshiba's infrastructure construction, including weak wiring, network deployment, technology selection and evaluation of infrastructure.
Participation in related product procurement, implementation and construction, project management and routine maintenance.
According to Toshiba Business Development Plan and Infrastructure Planning, understand business needs and network structure, provide infrastructure solutions, including products and solutions for Server Room、network、servers、basic operation and maintenance and so on.
Collaborate With the application department, before the system goes online,and completing the stress testing、security inspection、 monitoring、backup and trial operation.
Completing the daily operation and maintenance after the system goes online.
Participate in the installation of DC infrastructure, including network firewalls、routers、switches and wireless network equipment, as well as installation, testing, evaluation, and acceptance.
Participate in the design and planning of DC disaster recovery centers.
Responsible for negotiating related maintenance contracts with suppliers and outsourcing service providers, organizing and formulating relevant infrastructure operation and maintenance plans, and formulating assessments to ensure the stable operation of infrastructure facilities.
Responsible for monitoring and monitoring of network and related equipment.
2020.x -2020x China Telecom(SZ) Corp After-sales Technical Manager
1. Lead the after-sales department to provide infrastructure solutions, including Server Room、network、servers、DB 、Cloud and other infrastructure products instruction maintenance and solutions.
2. Construction and maintenance of terminals、Server rooms and equipment for the whole business customers, not limited to wiring and construction.
3. Responsible for ITIL System going online、process specification formulation and engineer KPI assessment.
4. Customers are mostly government customers, including 120 emergency centers、industrial and commercial、nuclear power、financial enterprises.
2020.x -2020x IBM (ShenZhen)Corp Network Specialist
1、Responsible for the design、modification、configuration、 equipment debugging、technical analysis、implementation plan of Japan Banks.
2、Responsible for communication with Japanese customers to understand the customers needs. Making the work plan, QA plan.
3、As Network Team PM,Responsible for arranging operations 、developing implementation plan and QA program.
Grasp the risk of operation and
the members's skill resources.
Regularly report project status to the delivery manager.
4、Responsible for the general manager of the Neon project office, leading the Team in the project room to carry out the work .
2020.x -2020x China Unicom Corp,ShenYang Technical Specialist
1、Responsible for the operation and maintenance of the company's telephone service system.
2、Responsible for equipment maintenance of ADSL broadband service department.
3、Responsible for the industrial and commercial administrative approval work of the Legal Affairs Department
4、Responsible for technical analysis and make implementation plan of the equipment.
项目经验
2020.x -2020x Neon Project PM
Software environment:Cisco IOS、IBM lotus Notes、Office、Windows、DB2
Hardware environment:SW2950、SW2960、SW3750、SW3750X、SW6500
Contents of a project:To assist the Japanese Team network, set up the two Chiba and Tama data center development environment.
Role:
1、AS the network Team PM,Responsible for arrangements for network team members's job、Developing job plan. Grasp the risk on the work, Arrange QA plan and standard operation method、Job data, DB management.
2、Automatic check of the network equipment configuration files, and contrast between the new and the old configurationg of SW 6509.
3、Basic connectivity testing.Fabrication of network physical topology and logical topology and Configuration remote import for SW3750.
4、Outline design of new network, new equipment quotation.
5、As the manager of NEON project room, coordinate other Teams operations, as well as the daily project room IT security inspection.
2020.x -2020x ICS PM
Software environment:Cisco IOS、Junos、IBM lotus Notes、Office、Windows、DB2
Hardware environment:SW2950、SW2960、SW3750、SW3750X、SW6500、ASA series、Juniper SRX and so on.
Contents of a project:In the customer network environment of various types of equipment systems, known Bug and unknown Bug assessment.And gives the solution to the corresponding Bug.
Role:
1.Evaluate the impact of the Bug to the customer in the customer network environment, and propose the corresponding solutions.
2.Remote to config the SRX250.3.PM work.Project operation time and Staffing arrangement, QA.
2020.x -2020x Tsukuba Bank Member
Software environment:Cisco IOS、Ctrix
Hardware environment:Cisco SW、Router 、ASA
Contents of a project:Customer service outlets's SW2950 devices are end of life , be replaced with SW2960.Customer's servers which is in the date center need to be migrated,and need to change the existing policy of network equipment.
Role:
1.Export the configurations of about 4600 edge SW.Such as 3750,2960.
2.According to the existing configuration, make a new configuration, and imported into the new equipment.
3.Test network connectivity.
4.Rewriting the Security policy of ASA network equipment.(ASA5505)
2020.x -2020x JCB Member
Software environment:Cisco IOS、Ctrix
Hardware environment:Cisco SW、Router 、ASA、Juniper OS
Contents of a project:Network design and implementation for the customer new projects.
Role:
1.To understand customer requirements, complete part of the design for Bank branches's network.
2.Draw the physical and logical topology of the new Bank branches.
3.According to the design plan, made the configurations.
4.In the Ctrix environment, import configuration.
5.Test network connectivity, as well as the matching degree of customer needs.
2020.x -2020x Helios Member
Software environment:Cisco IOS、Ctrix
Hardware environment:Cisco SW、Router 、ASA、Juniper OS
Contents of a project:Helios Bank of Japan, the design and implementation of the new site in Dalian.Zone issues in ospf.VPN access issue.
Role:
1.Gathering the site survey information of the new site.Understand customer requirements and write design solutions.
2.According to customer needs, to solve the problems such as VPN access.
3.BetweenExisting site and the new site,the OSPF network ZONE issues, to provide a reasonable solution.
2020.x -2020x Mizuho Bank Member
Software environment:Cisco IOS、Ctrix
Hardware environment:Cisco SW、Router 、ASA、Juniper OS
Contents of a project:Building the Mizuho bank's new site network environment.
Role:
1.Provide the customers with standardized configuration manual, troubleshooting manual.
2.Analyze the impact of Bug on equipment in customer network environment and provide solutions.(Base 3750,2960.1921,2911,3925,3945)
3.Configuration remote import into the customer network equipment.
2020.x -2020x Public telephone service department Member
Software environment:None
Hardware environment:Integrated circuit in ADSL modem.SPC exchange.
Contents of a project:To maintain the stable operation of the existing PSTN equipment, and solve the equipment malfunction.
Role:
1.Multi brand broadband routing hardware testing, maintenance.
2.PSTN telephone network SPC operation and maintenance support.
自我评价
I work steady, treat the work seriously.And i have a strong sense of responsibility、treat people sincerely、and good communication. always keep learning, and actively embrace change. I do like the network, with a certain analysis, design, application ability, has a strong learning ability and team spirit, able to quickly adapt to the working environment.
内容来源说明:本文章来自网络收集,如侵犯了你的权益,请联系QQ:2772182309进行删除。
https://www.100chui.com/article/278954.html